Spillway at Dam on Lake Joe Long

The final element in the construction of the dam is the spillway.  In mid December our spillway was cut out of the dam with the plans to pour concrete to finish before the end of 2010.  With the snow, rain and cold weather, it has been near impossible to do any work until this week.  This is a shot of progress this week.  With just a few more days of beautiful weather we should be completed with this poject.

 

Source: http://www.latimerbsa.org/blog/post/2011/02/19/Spillway-at-Dam-on-Lake-Joe-Long.aspx